
Add to Cart
Red Color PTFE Lined Pipe Fittings Various Sizes CS Materials
DESCRIPTION
PTFE lined pipe and fittings by compression molding, isostatic molding, injection molding, transfer molding, hot rotomolding, ram/paste extrusion, 3D rotational molding etc. Characters as below:
LINING PROCESSING SPECIFICATION
Product parameter:
Lining Material: PTFE
Nominal diameter: DN25~DN300,1"~12"
Length: ≤ 6000mm (size≤ DN150) ≤ 4000mm ( size> DN150)
Temperature range: -29°C~180°C
Applicable medium:
Able to transport any concentration of acid, alkali, organic solvents, strong oxidant, toxic and volatile, flammable chemicals.
PTFE Lined Pipe By Ram Extrusion
PTFE lined pipes with shortest lengths are around 100mm depending upon nominal bore and the longest lengths is 6 meters for up to DN150 and 3 meters above this. Generally constructed from carbon steel pipe, and stainless steel is also popular for dangerous access area where there is the potential for external corrosion.
MAIN PROPERTIES OF PTFE MATERIALS
Inspection Item | Unit | Standard |
Work Temperature | ℃ | -180 ~ +280 |
Tensile Strength | Mpa | ≥10 |
Compression Rate | % | ≥16 |
Rebound Ratio | % | ≥32 |
Continuous Max Pressure | Bar | 55 |
Gas Permeability | Cm3/S | <1x10~3 |
Creep-Relaxation | % | 40 |
Density | G/Cm3 | 2.1 ~ 2.25 |
INFORMATION ABOUT OUR FACTORY
Our Service
1) Your inquiry will be replied within 2 hours during working time,Within 24hours when rest time.
2) Our working time is 7.30 AM --17:30 PM,Monday to Saturday.
3) General samples time can be arranged within 2--5days.
4) Orders will be produced exactly as request and approved samples.
5) When mass production,we send photos to show the production line.And confirm the estimate time again.
6) At the end of mass production,photos and samples will send to you for approval.You can arrange the inspection.
7) Before shipment,our QC will have inspection to make sure the quality.
8) We always try best to ensure every order to delivery in time.
Payment Terms
1) T/T,Cash,L/C.Weston Union
2) 30% deposit,70% balance before shipment.
3) Lead time: 15 days after received deposited for 2tons.
4) Delivery way: By sea,By air, By EMS,DHL,UPS,TNT,FedEx.